Connected railway from Novi Sad to Subotica: Test runs in September

Connected railway from Novi Sad to Subotica: Test runs in September
Connected railway from Novi Sad to Subotica: Test runs in September
--

The event was attended by ministers Miloš Vučević and Goran Vesić, Chinese ambassador to Serbia Li Ming and deputy general director of the company “China State Railway Group” Wang Tong Jun, reports RTS.

Vucevic posted photos on Instagram.

The length of the railway route from the capital of Vojvodina to the Hungarian border is 108 kilometers, and the value of the works is one billion and 160 million dollars.

The Chinese consortium carrying out this capital project is already testing the railway at speeds of 200 kilometers per hour on the section from Novi Sad to Vrbas, and it is expected that test runs from Novi Sad to Subotica will begin in mid-September.

Regular high-speed train rides from Belgrade to Subotica, which should last 75 minutes, are expected in December this year.


The article is in Serbian

Serbia

Tags: Connected railway Novi Sad Subotica Test runs September

-

NEXT A delivery man from Belgrade angered the Serbs: He received a tip and stole a doormat from the corridor of the building