Connected railway from Novi Sad to Subotica

Connected railway from Novi Sad to Subotica
Connected railway from Novi Sad to Subotica
--

In Bačka Topola, the last part of the tracks on the Novi Sad – Subotica line was connected, thus completing the installation of new rails on the main section.

The event was attended by Ministers Miloš Vucevic and Goran Vesić, Chinese Ambassador to Serbia Li Ming and Deputy General Director of “China State Railway Group” Wang Tong Jun, reports RTS.

The length of the railway route from the capital of Vojvodina to the Hungarian border is 108 kilometers, and the value of the works is one billion and 160 million dollars.

The Chinese consortium carrying out this capital project is already testing the railway at speeds of 200 kilometers per hour on the section from Novi Sad to Vrbas, and it is expected that test runs from Novi Sad to Subotica will begin in mid-September.

Regular high-speed train rides from Belgrade to Subotica, which should last 75 minutes, are expected in December this year.

Tags


The article is in Serbian

Serbia

Tags: Connected railway Novi Sad Subotica

-

PREV Members of the headquarters for emergency situations put out the fire, inspectors on the ground (VIDEO)
NEXT Xi Jinping’s visit compliments the cooperation between China and Serbia so far